CHAPTER 73. STANDARDS FOR ONLOT SEWAGE
(2) The proposed absorption area not obstructed by stumps or other obstacles shall be roughed or plowed parallel with the contour to a maximum depth of 6 inches, using a multiple share chisel plow or similar implement attached to light-weight equipment. Rotary tilling is prohibited.
Get Price